Quality Management QMS: IQC/IPQC/FQC/OQC, AQL and 8D Closed Loop

Quality Management · QMS · Open Source MES

The goal of quality management is not to fill out more inspection forms, but to ensure that "inspections have standards, defects have closed loops, problems are traceable, and suppliers can be evaluated." Odoo Quality Management connects incoming, in-process, and outgoing inspections with work orders, batches, suppliers, and customer complaints, making it an important part of an open source MES.

Updated: 2026-10-25 · Guangzhou Odoo Smart Odoo Implementation Team

What is QMS? How is it different from "quality inspection"?

One-sentence answer: Quality inspection is an action, while QMS is a system. Quality inspection is responsible for "inspecting," while QMS is responsible for "setting standards, keeping records, tracing responsibility, and driving improvement."

A common problem in manufacturing companies is not the lack of inspection, but that inspection records are scattered across paper forms, Excel, and WeChat: when a customer complains, the batch cannot be found; when incoming materials from a supplier are nonconforming, there is no historical score; and the cost of rework and scrap cannot be calculated into work orders. The value of QMS is to turn these records into queryable, statistically analyzable, and traceable data.

Four inspection gates: IQC, IPQC, FQC, OQC

GateEnglishWhat to inspectCommon triggers
Incoming inspectionIQCDimensions, appearance, performance, and material of supplier incoming materialsReceipt confirmation, before batch warehousing
In-process inspectionIPQCFirst article, patrol inspection, and key parameters during the processProcess start, mold/line change, scheduled patrol inspection
Final inspectionFQCAppearance, function, and packaging of finished productsWork order reporting completion, before warehousing
Outgoing inspectionOQCShipping batches, labels, packaging, samplingDelivery order confirmation, before loading

Terminology and division of labor vary slightly across industries; sectors such as medical devices and automotive parts also impose additional requirements like environmental monitoring, sterility testing, and PPAP.

How to determine AQL sampling: not just "pick a few at random"

AQL (Acceptable Quality Limit) is the core parameter of a sampling plan. The common basis is GB/T 2828.1 (identical to ISO 2859-1), where sample size and acceptance number are determined by looking up tables based on lot size, inspection level, and AQL value.

  • Lot size: The quantity in the same batch, which determines the sample size code letter.
  • Inspection level: General inspection level II is most commonly used; special requirements may use S-1 to S-4.
  • AQL value: Set according to defect severity; critical defects are usually tightened or even 100% inspected.
  • Judgment: Accept if the number of nonconformities ≤ Ac, reject if ≥ Re; tightened/reduced inspection must follow switching rules.

The sampling plan should be solidified as quality points in the system to avoid each inspector consulting a different table and calculating a different set of results.

Defect closed loop: from "discovered" to "never happens again"

Finding a defect during inspection is only the beginning. A complete closed loop includes at least: defect classification → segregation → rework/repair/concession/scrap → root cause analysis → corrective and preventive actions → effectiveness verification.

8D is a commonly used method for solving recurring problems: D1 establish a team, D2 describe the problem, D3 temporary containment, D4 root cause analysis, D5 develop permanent corrective actions, D6 implement and verify, D7 prevent recurrence, D8 summarize and recognize. The system should record the responsible person, due date, and verification results for each step, rather than just circulating emails.

CAPA (Corrective and Preventive Action) must be linked to work orders, batches, suppliers, and equipment to identify whether "similar problems recur".

How to set quality metrics: six calculable measures

MetricDefinitionPurpose
Incoming material acceptance rateAccepted lots / inspected lotsSupplier evaluation and claims
First Pass Yield (FPY)First-time inspection accepted quantity / input quantityMeasures process capability, excluding rework
Defect rateDefective quantity / Inspected quantityDrill down by operation, product, and team
Rework rateRework quantity / Completed quantityMeasures rework cost
Customer complaint closure cycleComplaint closure date − Receipt dateMeasures quality response speed
Cost of qualityRework + Scrap + Line downtime + Customer complaint lossMonetize quality losses

Metric definitions must be standardized across the plant and aligned with financial cost accounts; otherwise, the quality and production departments will not be on the same page.

How quality management collaborates with open-source MES

  • Collaboration with work orders: Operation reporting triggers IPQC; failed inspections can freeze work orders or transfer to a failure location.
  • Collaboration with batches: Inspection records are linked to batches/serial numbers, supporting forward and backward traceability.
  • Collaboration with suppliers: IQC results feed into supplier scoring, affecting subsequent procurement and claims.
  • Collaboration with equipment: Equipment failures and process parameter anomalies can trigger quality alerts.
  • Collaboration with costs: Rework, scrap, and line downtime losses are allocated to work order costs.

To understand the complete chain of work orders, reporting, traceability, and OEE, you can read Open-source MES system topic。

Non-standard single-piece small batch: inspection rules must follow the order

Non-standard products have small batches and many specifications. Using a generic inspection form forces workers to just tick 'pass'. A more practical approach is to build inspection templates by product family and process, automatically bringing out key dimensions, materials, and customer special requirements when an order arrives; first article must be inspected, in-process inspection by risk sampling, and final inspection and outgoing inspection upon completion.

Nonconformities go through review, and rework, concession, and scrap are all recorded. The quality module of non-standard manufacturing ERP focuses on reusable templates and records traceable to the project.

Common questions about quality management and QMS

Does QMS have to be an independent system?

Not necessarily. In-process inspection, first article, and patrol inspection are strongly related to work orders, so it is smoother to put them in MES; supplier quality, customer complaints, and CAPA are cross-departmental, so an independent QMS or independent module is clearer.

Is AQL sampling suitable for all products?

Not suitable. For destructive testing, critical safety parts, and products requiring full inspection by regulations, inspection should be performed according to standards or customer requirements; AQL is only applicable to batches that can be sampled.

Must nonconforming items be scrapped?

Not necessarily. Depending on the degree of nonconformity, you can choose rework, repair, concession acceptance, or scrap; the key is to keep review records and evidence of customer/regulatory permission.

To what extent should quality traceability go?

At least trace to batch, process, inspection records, and supplier batch. Regulated industries such as automotive and medical also need to trace equipment parameters, operators, and environmental records.

How is quality data used in supplier management?

Include IQC pass rate, batch defects, claims, and delivery performance in supplier scoring. The scoring results should affect procurement share and admission, otherwise the data has no binding force.

How long does it take to implement quality management?

A single-workshop inspection loop typically takes 2–3 weeks; including supplier quality, CAPA, and traceability typically takes 4–8 weeks. It depends on whether inspection standards are documented and whether master data is accurate.