MRP Manufacturing: From BOM and Scheduling to Open-Source MES Shop Floor Execution

MRP · Open Source MES · Production Management

Odoo MRP Manufacturing puts multi-level BOMs, routings, finite capacity scheduling, material requisitions, work reporting, quality inspection, and work order costs into a single data set; when extended to operation-level reporting, batch traceability, and OEE, it forms the execution layer of an open-source MES.

Many factories still rely on Excel for scheduling: sales chases delivery dates, planners schedule by experience, the shop floor works from paper work orders, and finance back-calculates costs at month-end. The value of Odoo MRP is not just another scheduling interface, but enabling the entire chain—sales order, work order, material requisition, work reporting, receipt, and cost—to share a single data chain.

Updated: 2026-10-25 · Guangzhou Odoo Smart Odoo Implementation Team

What Problems Does Odoo MRP Solve in a Factory?

In a nutshell: MRP answers “what to produce, what materials are needed, and when to finish”; MES answers “which work order is in progress, at which operation, who did it, and how many passed”.

Odoo's manufacturing module covers both planning and execution: it connects upward to sales orders and forecasts, and downward to operations, work centers, quality inspection, and inventory. For high-mix low-volume, make-to-order (MTO), and integrated manufacturing-trading factories, the most immediate benefits are calculable delivery dates, visible material shortages, and traceable costs.

  • After receiving a sales order, simulate “can we still deliver if we insert this order now?”
  • MRP explodes requirements by BOM, generating purchase suggestions and production work orders
  • Work order material requisition, work reporting, and receipt are automatically linked with batch numbers
  • Work order costs flow back to finance, showing standard cost variances

Six Core Capabilities

1. Multi-level BOM and Routings

Supports multi-level BOMs, substitute materials, BOM versions, operations, work centers, and standard labor times. BOM accuracy is a prerequisite for go-live: if the BOM is wrong, material requisitions, kitting, and costs will all be wrong.

2. Planning and Finite Capacity Scheduling

From MPS master production scheduling to MRP runs and Gantt scheduling, it supports finite capacity, ASAP scheduling, priorities, shortage reports, and work order splitting. Scheduling is not about filling in dates; it's about scheduling according to the load on bottleneck work centers.

3. Material Requisition, Work Reporting, and Receipt

Work orders can be linked to material requisitions, material returns, and finished goods receipts; the shop floor supports barcode scanning for work reporting, continuous production, flexible consumption, and batch/serial number generation. Work reporting data is written back to work orders in real time, reducing after-shift data entry.

4. Quality Inspection

IQC incoming, IPQC in-process, and FQC/OQC outgoing inspections can be tied to operations or receiving steps, supporting first article inspection, patrol inspection, AQL sampling, and defect rework.

5. Work Order Cost

Work order costs support estimated vs. actual comparison, break down materials, labor, manufacturing overhead, and subcontracting, analyze standard cost variances, and trace back to financial vouchers.

6. Batch and Serial Number Traceability

Supports forward and backward traceability, records supplier batches, production batches, operations, and shipped customers; can manage expiration by FEFO, and quickly locate problem batches when customers complain.

Six Data Metrics to Monitor After Go-Live

MetricDefinitionReference Target
BOM AccuracyNumber of BOM lines consistent with physical items and drawings / Number of sampled lines≥98%
Kit Fill RateNumber of kitted work orders / Number of planned work orders≥95%
Number of Work Orders with Material ShortagesNumber of work orders frozen or delayed due to material shortagesDecrease weekly
WIP (Work in Process)Quantity and amount of work orders that have started production but are not completedSet upper limit by workshop
OEEAvailability × Performance × QualityEstablish baseline first, then improve quarter by quarter
Work Order Cost VarianceActual cost − Standard costAnalyze monthly, drill down by work order

The calculation basis must be unified across the entire factory; if different departments each use their own set, disputes will continue even after the system goes live.

Division of labor between MRP and MES: one calculates accurately, the other executes solidly

LayerMRP is responsible forMES is responsible for
PlanSales/forecast, MRP calculation, work order release, purchasing suggestionsFinite capacity scheduling, bottleneck load, shifts and workstations
ExecutionWork order status, material picking and receiptOperation reporting, scan-to-start, exception reporting, WIP flow
QualityInspection requirement triggeringIQC/IPQC/FQC, first article, AQL, defect closed-loop
TraceabilityBatch/serial number master dataForward and backward traceability, operation and personnel records
CostWork order cost summary and variance analysisLabor hours, piecework, equipment downtime and efficiency data

In Odoo, the two layers are not two separate systems: manufacturing, shop floor, quality, maintenance, and inventory share one database. To learn more about MES-side scheduling, reporting, OEE, and traceability, read Open-source MES system topic。

How to schedule production for high-mix low-volume? Six steps

  1. Standardize routings and standard labor hours. Without standard labor hours, scheduling is just guesswork.
  2. Identify bottleneck work centers. Schedule bottlenecks first, then non-bottlenecks; otherwise, no matter how full the schedule is, you still won't ship.
  3. Finite capacity scheduling with Gantt charts. Validate workload by work center, adjust by drag and drop, and conflicts are surfaced automatically.
  4. Use shortage orders to freeze work orders that are not fully kitted. Do not let orders with incomplete materials take up capacity for now.
  5. Split work orders or run continuous production. Break large batches into deliverable small batches to reduce work-in-progress buildup.
  6. Review daily attainment rate and OEE. Deviations between plan and actual must be visible the same day, not discovered at month-end.

From 0 to 1: The Go-Live Path

Step 1 · Master Data (1–2 weeks)

Material codes, BOM, routings, work centers, teams. Acceptance: BOM accuracy ≥98%.

Step 2 · Work Order Closed Loop (2–3 weeks)

Sales/Forecast → MRP → Work Order → Material Issue → Reporting → Receipt. Acceptance: Reporting timeliness ≥95%.

Step 3 · Quality and Cost (2–3 weeks)

Inspection points, batch traceability, work order cost variance. Acceptance: Any finished product can be traced back to raw material batch within 5 minutes.

The cycle is an empirical range, depending on master data quality, scope boundaries, and internal cooperation.

Four Additional Constraints in Non-Standard Manufacturing (ETO)

MRP for ETO orders calculates not only quantity and timing, but also four additional things: one BOM per order, design changes, project number aggregation, and on-site delivery. If the BOM is not finalized, lock long-lead materials first, then supplement short-lead materials after finalization; when changes occur, first check purchased and in-process work orders; costs and labor hours are all tied to project numbers; the final installation and commissioning must also be scheduled.

If these four things are not resolved, no matter how fast MRP calculates, it only advances errors. For scheduling in non-standard manufacturing ERP, first lay out the constraints, then discuss optimization.

Frequently Asked Questions about Odoo MRP

Are Odoo MRP and MES the same thing?

No. MRP handles planning and material requirements, while MES handles shop floor execution and data collection. Odoo covers core MES scenarios through a combination of modules such as Manufacturing, Shop Floor, Quality, and Maintenance, and both share a single set of data.

Can Odoo MRP do finite capacity scheduling?

Yes. Use Gantt scheduling, work center load, priority, ASAP scheduling, shortage orders, and split work orders to fill the bottleneck work centers first.

Is it suitable for high-mix low-volume factories?

Yes. Especially for make-to-order, frequent line changes, and scenarios with many substitute materials; the prerequisite is that the BOM and routing are sufficiently accurate.

What if the BOM is inaccurate?

Clean up first, then go live. Clean layer by layer according to "material code—BOM structure—usage—substitute materials", cross-verify with physical inventory counts and drawings, and achieve an accuracy rate of over 98%.

Can it integrate with barcodes and IoT devices?

Yes. Barcode scanners, barcode printers, electronic scales, and weighing equipment can be connected via IoT Box or edge gateway; for more complex device protocols, it is recommended to collect data via SCADA first and then integrate.

How long does it take to go live?

The first closed loop for a single workshop typically takes 2–4 weeks; the complete scope including quality, traceability, and cost typically takes 6–12 weeks. Multi-factory or historical data migration will take longer.