Equipment Maintenance · TPM · Open Source MES
How well equipment maintenance is done ultimately shows up in OEE, delivery times, and maintenance costs. Odoo Equipment Management puts equipment records, preventive maintenance, inspections, fault reporting, spare parts, and downtime reasons into a single set of records, turning "fix it when it breaks" into "maintain based on status."
Updated: 2026-10-25 · Guangzhou Odoo Smart Odoo Implementation Team
What is the relationship between equipment maintenance and TPM?
One-sentence answer: Equipment maintenance is a set of actions, while TPM (Total Productive Maintenance) is a management mechanism that involves operators, maintenance workers, and management together.
TPM is often summarized as the "five pillars": autonomous maintenance, planned maintenance, focused improvement, education and training, and initial management. In a system, it must at least answer: where is the equipment, who is responsible, how often is maintenance performed, when was the last maintenance, how long did it take to repair after a breakdown, are spare parts sufficient, and which work orders were affected by downtime.
Four maintenance strategies: don't just "fix it when it breaks"
| Strategy | Approach | Applicable Scenarios | Risk |
|---|---|---|---|
| Breakdown Maintenance (BM) | Fix it when it breaks | Non-critical, low-cost equipment | Unplanned downtime is uncontrollable |
| Preventive Maintenance (PM) | Periodic maintenance and parts replacement | Critical equipment, wear parts | Over-maintenance, waste of spare parts |
| Condition-Based Maintenance (CBM) | Triggered by conditions such as vibration, temperature, and current | High-value, continuous operation equipment | Requires sensors and algorithms |
| Improve maintenance CM | Improve design, process, and operation from failures | Recurring failures | Requires cross-department collaboration |
Most factories focus on PM with BM as a fallback; gradually introduce CBM for critical equipment, and don't aim for "full prediction" right away.
What fields should be recorded in the equipment ledger?
- Identity: Equipment code, name, model, serial number, supplier, commissioning date.
- Location: Factory, workshop, production line, work center, to facilitate association with scheduling.
- Criticality level: A/B/C, determines maintenance frequency and spare parts strategy.
- Maintenance plan: Cycle, items, responsible person, last/next date.
- Technical parameters: Capacity, precision, energy consumption, key process parameters.
- Spare parts list: Critical spare parts, minimum stock, substitutes.
Equipment codes must be consistent with work centers, work orders, and OEE data; otherwise, downtime cannot be attributed to specific work orders.
Inspection, repair requests, downtime: turn on-site actions into data
- Scan code inspection: Operators scan codes by shift and enter temperature, pressure, oil level, abnormal noise, etc.; abnormalities automatically generate repair requests.
- Fault repair request: Take photos with mobile phone, select fault code, mark downtime start time.
- Dispatch maintenance: Assign to maintenance workers based on skills and shifts, record arrival, repair, parts replacement, and time spent.
- Downtime attribution: Faults, material shortage, mold change, waiting for inspection, no orders should be counted separately, not all as "equipment failure".
- Review and Improvement: Recurring faults enter improvement or CAPA, and maintenance cycles and spare parts lists are updated.
How Equipment Maintenance Affects OEE
OEE = Availability × Performance × Quality. Equipment maintenance most directly affects "availability," but many factories mix the six major losses together, leading to incorrect improvement directions.
- Failure Loss: Unplanned downtime, affecting availability.
- Changeover/Adjustment Loss: Line changes, machine adjustments, trial production, affecting availability.
- Idling/Minor Stoppage: Material jams, material shortages, minor stops, affecting performance.
- Speed Loss: Actual cycle time is lower than theoretical cycle time, affecting performance.
- Defect/Rework Loss: Affects quality rate.
- Trial Production/Startup Loss: Warm-up, first article, parameter stabilization.
It is recommended to first record downtime in five categories: "failure, changeover, material shortage, waiting for inspection, no order," and then gradually subdivide into the six major losses.
Six Equipment Metrics
| Metric | Definition | Purpose |
|---|---|---|
| MTBF | Total operating time / Number of failures | Measures equipment reliability |
| MTTR | Total repair time / Number of failures | Measures maintenance efficiency |
| Equipment availability | Actual operating time / Planned operating time | The first component of OEE |
| Maintenance plan completion rate | Completed maintenance on time / Planned maintenance | Measures PM execution |
| Spare parts fulfillment rate | Spare parts needs met on time / Total needs | Measures spare parts strategy |
| Maintenance cost per unit | Total maintenance cost / Operating hours or output | Measures maintenance economics |
How does it integrate with open-source MES and scheduling?
- Integration with scheduling: Equipment downtime or maintenance plans occupy capacity, and Gantt scheduling should automatically avoid them.
- Integration with work orders: Work orders affected by downtime must record the cause and lost labor hours.
- Integration with quality: Abnormal equipment parameters can trigger quality alerts or first-article re-inspection.
- Integration with spare parts: Spare parts issued for maintenance automatically deduct inventory, and falling below safety stock triggers replenishment.
- Integration with costs: Maintenance labor hours, spare parts, and downtime losses are included in equipment or work order costs.
To learn about the complete chain of work orders, work reporting, quality, and OEE, please read Open-source MES system topic。
For equipment in non-standard workshops, maintenance cycles cannot be one-size-fits-all
Non-standard orders involve frequent line changes, and equipment loads fluctuate. Uniform monthly maintenance is often either too early or too late. Trigger maintenance based on operating hours, output, or condition; set separate cycles for critical equipment; and conduct shift handover inspections for shared equipment. Only when downtime causes are categorized into material shortage, awaiting inspection, mold change, and equipment failure does OEE become meaningful.
Include project numbers and workstations in the equipment ledger so maintenance costs can be allocated to orders. In equipment management for non-standard manufacturing ERP, first clarify downtime causes.
FAQs about equipment maintenance and TPM
Is equipment maintenance solely the responsibility of the maintenance team?
No. TPM emphasizes autonomous maintenance: operators are responsible for daily inspections, cleaning, tightening, and lubrication, while the maintenance team handles professional maintenance and troubleshooting; otherwise, maintenance is always firefighting.
How to set maintenance intervals?
Prioritize equipment manuals and manufacturer recommendations, then adjust based on failure history. Critical equipment can be triggered by operating hours, output, or condition; do not use a one-size-fits-all interval.
Can predictive maintenance be done without sensors?
You can start with a simplified version of 'manual inspection + failure history'. Establish a baseline using handheld measurements of temperature, vibration, and current along with inspection records, then gradually implement online monitoring.
Is more spare parts inventory always better?
No. Set minimum stock levels based on criticality, procurement lead time, and failure rate; ensure supply of critical spare parts, while general spare parts can be shared or consigned.
Is low OEE always an equipment problem?
Not necessarily. Material shortages, waiting for inspection, no orders, and mold changes can all lower OEE; first clarify the causes of downtime, then decide whether to buy equipment, change processes, or adjust scheduling.
How long does it take to implement equipment management?
For a single workshop, equipment ledger and maintenance repair typically take 2–3 weeks; with inspection, spare parts, OEE, and scheduling integration, it usually takes 4–8 weeks. It depends on whether equipment coding and downtime reasons are standardized.